B210 Course Project

359 Words1 Page

ASC to provide interior photos from B210 for guidance. Complete
Jeff Huffman/ASC to provide CH2M maximum quantity of double rooms that lodging facility would need.
Jessica Palen/ASC to provide quantity of industrial washers and dryers needed if setup to be located in this lodging facility. Count of room reduction to allow for commercial laundry.
David Winkler/ASC to provide which floor skybridges will be connected at and height required to move equipment underneath safely.
 IT&C
Ray Thom/MBI to check on door opening (direction of swing) requirements for communication room for Elisa Pittner/CH2M.
Ray Thom/MBI to provide list of communication room assumptions to Paul Sheppard/NSF for review.
Briana Ernsting/CH2M to provide height of TV mounting options to Ray Thom/MBI.
ASC to confirm if …show more content…

Paul Sheppard/NSF to provide requirements for NSF senior staff lounges that will be different than other common areas. An option for one of the subsequent dorms.
 Mechanical
David Winkler/ASC to set up meeting with Merrick to give an overview of water re-use plan.
 Structural
David Winkler/ASC to provide Mark Parent/CH2M the contact for geotechnical work involved in other builds.
David Winkler/ASC to provide snow study results to Mark Parent/CH2M. Complete
Mark Parent/CH2M to check temperatures to see if cold weather steel is required for climate. No preference if not required.
 Civil
David Winkler/ASC or Merrick to provide Joe Taylor/CH2M the 0 grade elevation and floor height.
David Winkler/ASC to provide snow modeling to determine if any requirement improvements of design need to be made based of off future builds. Complete