7.4 Material Retrieval All SSP owned material in storage at the SWSLCS facilities is to be pulled or retrieved by SWSLCS personnel as follows: NOTES: • Although a request to pull material for shipment normally begins the material retrieval process, other local requirements and project actions can also start the process such as testing of material, kitting of material, or engineering requests. • Guidance MITA-5 Gyroscope shipments shall be in accordance with OP-6681-010. a. Upon receipt of an email or TGIN request to pull material from storage, generate a pull request including, at a minimum, part number, lot number, location, and quantity. 1. For delivery internal to NSWC Crane, contact the requestor for delivery information. 2. For shipping …show more content…

For each individual pull or pick request, locate the appropriate storage container (bin, box, package, rail, etc.) and retrieve the appropriate material. If a discrepancy is found, the IM shall notify the requestor and update the database as needed. c. As required for ESD materials, take the storage container to an approved ESD workstation. d. Check the package markings, item part numbers, serial numbers, and/or lot numbers against the pull request to ensure that it is the correct material. Notify the IM to resolve any differences. e. Count out and separate the quantity required from the material that is to be placed back into storage. If all or part of the material is NOT found, contact the IM to resolve any differences. f. Spot inspect remaining item packaging and/or other packing materials for visual damage or deterioration. If visual damage or deterioration is found, notify the IM. g. Upon notification of any discrepancies, the IM shall perform the following actions as …show more content…

Verify that the actual quantity is as requested. 4. If needed, determine the required corrective action. h. As required for ESD components, place the material that was requested in a static-free container and label with a minimum of the part number and quantity. i. Place the material that is to be re-stored back into the storage container and return container to its original storage location. j. Before picking or pulling request is initiated, IM must first provide the OMA with RFI request. OMA perform movement request as per SSP Navy ERP Handbook v1.0. The person doing the picking must ensure the material is picked at the right picking location. In case the material is not at the location as shown on the RFI, report inventory problems to IM and OMA respectively. k. If picked or pulled from another building, the material may be taken to Building 3210. NOTE: Larger or heavier material need not be taken to Building 3210. l. Return the pull request to the SWSLCS IM. m. For shipment requests only: NOTE: Shipment of MK305 shipping containers shall be in accordance with OP-6681-015. 1. The IM shall access ERP and generate the DD Form

More about 7.4 Material Retrieval

Open Document