Hulamin Limited Supply Chain Management

1311 Words3 Pages

Hulamin Limited is the leading producer of semi-fabricated aluminium products in Africa, and the main key supplier of aluminum rolled products to the South African industry. It has 2 main operations i.e. Rolled products and Extrusions, with rolled products contributing to approximately 80% to its profits. Hulamin Rolled Products produces rolled sheet, foil, paste, can stock and plate products conforming to international standards with 70% of its production exported to customers round the world.

Hulamin Rolled products is situated in Edendale, Pietermaritzburg, with two manufacturing sites Camps Drift and Edendale, which are situated within a radius of 4km apart. Both plants are equipped with hi-tech production processes and equipment with the Camps drift plant layout as shown in figure 1. Hulamin Rolled products employs 1836 people, with the 500 support stuff filling the marketing department , technical department, manufacturing department, engineering department, human resource department and the quality department. I’m currently employed as a Metallurgical Technology Specialist forming part of the Research and development group for the Technical department. My role provides the following Specialist metallurgical support optimization across all manufacturing areas;

• New product and Process development and optimization support

• Specialist technology development

• Specialist training

• External technical support development

• Technical knowledge management

• Specialist knowledge development

2. AS-IS Process map

AS-IS process maps are used to graphically depict a process with more details required to clarify what actually happens in each process. AS-IS process maps helps to identify waste and defect...

... middle of paper ...

...
Kuilman, H. 2013. USB Operations and Supply Chain Management course notes

BMGI, 2013, Green belt notes (define phase). [Online] available:

http://africa.bmgi.org/repo/Documents/T-The_Eight_Types_of_Waste.pdf Accessed 24 December 2013

BMGI, 2013, Green belt notes (define phase). [Online] available:

http://africa.bmgi.org/repo/Documents/T-Mid-Level_Process_Map.pdf Accessed 24 December 2013

http://www.rexam.com/files/reports/2012ar/index.asp?pageid=17

Closing the loop [Online] available:

http://www.canmaker.com/news/index.php/feature-articles/2623-closing-the-loop Accessed 19 February 2014

Method of making aluminum can body stock and end stock from roll cast stock Patent US 5714019 A [Online] available:

Production And Processing Of Aluminum [Online] available:

http://www.tms.org/pubs/books/4062.chapter2.pdf accessed 21 February 2014

More about Hulamin Limited Supply Chain Management

Open Document