a) Equipment such as switchgear can be worked on safely by ensuring a range of actions have taken place. The equipment used on the high voltage lines are the same.
a. Create a safety program
b. All of the sources of current to the equipment should be isolated and signs need to be fixed to ensure that the nature of the equipment is known
c. Ensure that the equipment is isolated by proving it
d. Ensure that all necessary earth connectors are then attached to the isolation points and any overhead wires
e. The permit of work is to be issued to allow the work to go ahead. It must include marking the point of work as well as showing the competent person the safety arrangements that are in place for the duration of the work
f. Complete work
g. Make the work safe and check that this is the case
h. Destroy the permit to work as well as cancelling it
i. Place equipment back in a state that will allow normal operation. …show more content…

The first method of insuring a correct reading is obtained is through using one wattmeter on a balanced load. Using this on an unbalanced load will lead to an inaccurate reading for power. To complete this method a reading with a wattmeter connected from a single line to neutral via the voltage probes and in line with the line on the current probes. By multiplying the value of the wattmeter by three the total system power is found.
The second method of measuring three phase power is the useful for both balanced and unbalanced loads. By connecting a wattmeter with its current probes in series with red phase and volt probes between red and yellow phase. The second wattmeter should be connected with its current probes in series with the blue phase and the volt probes between the blue and yellow phases. By adding these two values together there total power for the system can be