Using TOC To Improve Project Management.
________________________________________
Most projects, whether big or small, are undertaken either to create a new structure, such as a plant, an airport, an Olympic stadium, a bridge, a new product, etc., or to modify an existing structure, such as a plant expansion, adding a new production line, expanding a highway, etc. In most cases, the late completion of the project, such as finishing the Olympic stadium two weeks after the opening of the Olympics, or having a new airports' opening delayed until after the elections, etc., generally carries with it some significant negative ramifications for the project owner. At the same time, there are many cases where the early completion of the project will provide the project owner with significant positive ramifications, such as the market share gained by preempting the competitions' launching of a new product, or the increase in sales achieved by bringing the plants productive capabilities on-line sooner, etc.
Another important characteristic of most projects is that many of the resources performing the individual project tasks are sub-contracted resources, at least in terms of their relationship to the project manager. As sub-contracted resources, they are often committed to completing more than one project specific task during any given window of time. The issue of resource availability is often further complicated by the nature of the disturbances associated with most project specific tasks. As a result, most sub-contractors will only commit to completing a project specific task within a window of time and by a specific date, regardless of the fact, that the actual time required to complete the project specific task is generally much smaller than the allotted time window. Hence, the detail scheduling of the sub-contractors resources is generally something that most project managers have little or no direct control over.
Lastly, most projects usually involve the investment/expenditure of one or more limited resources, such as money, peoples time, skills, equipment, etc. As a result, most people try to maximize the return on these investments/expenditures, thus making the overall lead time, from start to finish, the key factor in almost every project.
As with most decisions involving the use of limited resources, there is the need to consider trade-offs. Trade-offs that often appear as a conflict between the availability of the limited resource, which is usually money, and the overall project lead time from start to finish. As long as the decisions involve trade-offs which cannot be quantified into a single measurement, that is without a Final Judge, then the determination of "best" will always remain somewhat less than objective.

How to Cite this Page

MLA Citation:
"TOC in Project Management." 123HelpMe.com. 20 Jan 2020
    <https://www.123helpme.com/view.asp?id=94252>.

Need Writing Help?

Get feedback on grammar, clarity, concision and logic instantly.

Check your paper »

The Theory of Constraints in Project Management Essay

- The theory of constraints (TOC) focuses on using organizational change techniques in order to increase company profits. Goldratt (1984) introduced the theory of constraints in a business novel titled, The Goal. The TOC states that all companies have one constraint that prohibits them from reaching strategic goals or objectives (Aryanezhad, Badri, & Rashidi-Komijan 2010; Gupta, & Boyd, 2011). The TOC was derived from optimized production technology (Fry, Cox, & Blackstone, 1992). In 1990, the basic principles of the theory of constraints were established (Ronen & Starr, 1990)....   [tags: theory in practice, recession, hiring process]

Research Papers
1850 words (5.3 pages)

Technology Project Essay

- Technology projects can be challenging to complete on-time and within budget. Analysis of some 13,000 plus projects provides a sobering account of technology project challenges. The Standish Group's "CHAOS Summary 2009," showed that only 32% of all projects succeeded and were delivered on time and within budget; 44% were late, over budget, and/or with less than the required features and functions. An astounding 24% of the projects examined failed, were cancelled prior to completion, or delivered and never used....   [tags: How to do a project, Steps]

Research Papers
1038 words (3 pages)

Department Of Civil And Natural Resources Engineering University Of Canterbury

- DEPARTMENT OF CIVIL AND NATURAL RESOURCES ENGINEERING UNIVERSITY OF CANTERBURY ENCM620A CONSTRUCTION PROCUREMENT AND CONTRACT ADMINISTRATION Research Assignment Vivek Thirani (22008066) 10/16/2015 Maintaining equality in terms of sharing the profits and losses equally between the client and the contractor in an alliance delivery model.   ABSTRACT 1. INTRODUCTION 1.1 Background The New Zealand construction industry is a large and highly diverse sector of industrial activity that provides, maintains and manages the fixed infrastructure for people to live and work....   [tags: Construction, Project management, Project]

Research Papers
1252 words (3.6 pages)

Management Approach: The Theory of Constraints by Eliyahu M Goldratt Essay example

-   Executive Summary In this research assignment, I will be discussing about the Theory of Constraints (TOC), the literature review about the TOC, that is, what the literature and other authors are saying about this topic. I will also discuss the evidence of the practice of the TOC. Finally, in conclusion I will sum up the findings of my research.   Table of Content Executive Summary 2 Table of Content 3 1. Introduction 4 1.1. Theory of Constraints 4 1.2. Background 4 2. Literature Review 5 3. Case Study: US Army recruiting 6 4. Conclusion 7 5. Referencing 7   1. Introduction 1.1. Theory of Constraints Theory of constraints (TOC) is a systematic management approach that focuses on...   [tags: firms´progress, improvement tool]

Research Papers
2374 words (6.8 pages)

Essay about Defining 3 Rules Of Constraint Management

- Real World Process Interview Define 3 Rules of Constraint Management According to the textbook Eli Goldcratt implemented the Theory of Constraints (TOC). TOC is defined as the business approach to improve production, distribution and project management. (Jacobs, 2013) Goldcratt’s instituted a 5 step process to improve and assess current operations and productions. Goldcratt’s stated the following are rules for the management of constraints which include: “to identify the system constraints and weakness; decide how to exploit the constraints; subordinate everything else to that decision; elevate the system constraints if previous steps are broken start the process over again.” (Jacobs, 2013)...   [tags: Theory of Constraints, Constraint]

Research Papers
721 words (2.1 pages)

Project Management : A Project Manager Essay

- Project management is an industry that is growing, and the demand for individuals that have this type of knowledge is high. I encounter business individuals on a daily basis and they always tell me that having project management knowledge or having a certification for it, will help me in the work force. I ‘m glad I took this class, because the material is helpful, and when we graduate, we will be ready to enter the work force. I have learned the ten knowledge areas, and five process groups, all which are essential for the project manager....   [tags: Project management, Management, Project manager]

Research Papers
879 words (2.5 pages)

Essay on Project Management Plan For A Project

- Picture a person who that is juggling doing several things at once; they are balancing a stick in one hand and another stick on their nose. Each stick has a plate on the top that they want to keep spinning without losing balance or dropping either. There is a lot going on in those actions including the exact timing of when to reach up and spin a plate, constant body movement to keep the sticks balanced as not to fall, and a continued push from the free hand to keep both plates spinning. This paradigm could be used to describe integration knowledge area of project management....   [tags: Project management, Management, Planning]

Research Papers
846 words (2.4 pages)

Project Controls And Project Management Essay

- I have a sound understanding of project controls fundamentals, which is proven by my accreditations in project controls and project management disciplines as follows: I am among the few cost engineers in Australia, who were granted the globally recognised cost engineering credential of CCP (Certified Cost Professional) by Association for the Advancement of Cost Engineering (AACE) in Canada. This credential proves my extensive understanding of cost engineering, cost estimation, cost controlling, budgeting and forecasting, project accounting, and cash flow management....   [tags: Project management, Management]

Research Papers
721 words (2.1 pages)

Wal-Mart's Performance Improvement Project Essay

- Wal-Mart's Performance Improvement Project Wal-Mart has difficulty developing and implementing a process that can improve the product material quality since there are so many vendors, manufacturers and international companies involved. They need to implement a set of standards that every company needs to adhere to by setting acceptable standards that must be met across the board whether the company is a local business or a foreign company. Most of the material defective products come from overseas....   [tags: Business Strategy Analysis]

Research Papers
1778 words (5.1 pages)

Project Management Essay

- Functional, Matrix, and Dedicated Team Approaches to Managing Projects These team approaches have all different set of advantages and disadvantages to them. The major difference between the three is that functional team approach is “employed” totally from within the parent organization. Functional approaches have absolutely no cost to them and provide more than adequate flexibility in the use of staff. However, its disadvantages include poor integration and a distinct lack of ownership that does not leave employees discouraged to project related activities....   [tags: Project Management]

Research Papers
1170 words (3.3 pages)

Hence, the problem of "how to best evaluate" the myriad of proposed projects, particularly when all of them promise great benefits, also remains highly subjective.
Through the use of the TOC Thinking Processes it becomes apparent why the existing methods used to quantify such decisions, such as "Net-Present-Value" or "Net-Future-Value", did not really provide the sought after Final Judge. The main reason stems from the fact that the true investment value of a limited resource is not adequately represented by considering only the number of limited resource units to be invested. As with any limited resource, the real key to its value resides in its limited nature. Hence, determining the true value of any limited resource investment requires a quantification that is based on both the number of limited resource units (dollars) to be invested, and even more importantly, the number of time units (days) that these limited resource units (dollars) will not be available. This combined unit of measure, often referred to as "dollar-days", is used in a number of the TOC applications.
In the TOC application to project management, the "dollar-day" unit of measure is used to quantify a projects' limited resource investments as a function of time. When all of the limited resource investments of a project are quantified in this way the end result is a single measurement that does, in fact, prove to be good Final Judge. This Final Judge is commonly referred to as "Flush".
Having a Final Judge solves only part of the problem as it addresses only the quantification of limited resource investments but not the timing of these investments. The planned timing of limited resource investments in most projects is a result of project planning. While having the project completed as planned, on time and within budget is the objective of project planning, it is very often not the reality. Sometimes, to the extent, that the operating rule used by some companies is, that "no project ever finishes as planned and/or on time and/or in budget". Hence, there is a need to have a realistic project plan if the quantification provided by a Final Judge is to have any real meaning.
While the examples in The Goal are more production related, the same underlying understanding, with regard to statistical fluctuations (disturbances) and dependent events (chains), can be used to improve project management. The changes outlined in The Goal, are often referred to as the shift from the "Cost World" to the "Throughput World". In the "Cost World", management efforts are directed toward improving each operation, as if they were separate links in a chain. These efforts often result in improvements in the overall weight of the chain but not necessarily in its strength. And, generally it's strength not weight that determines the overall performance of any chain. What determines the overall strength of a chain? The weakest link. In the "Throughput World", management efforts are directed, via the focus provided by the weakest link(s) - the constraint(s), toward improving the various links in the chain. These efforts lead to improvements in the overall performance or strength of the chain, but not always in its weight.
If we make use of the TOC Thinking Processes, the Five Focusing Steps and the chain analogy, then it becomes apparent that one of the constraint(s) that any project planning approach must addressed, is " to provide the shortest overall lead time from start to finish". In most projects it is not only the project layout, as in "Critical Path" planning, but also the availability of the resources assigned to each of the project tasks, that determines the overall project lead time. Thus it is the combination of resource availability and project layout together that actually determined the overall lead time of any project and as such both together should be managed as the constraint. With the constraint(s) properly identified, it is now possible to buffer them against disturbances, thus providing a realistic project plan, which is the TOC approach to project planning generally referred to as "Critical Chain".