Minimizing the Delay on Completion of the Construction Projects in Jaffna District

2597 Words6 Pages

Table of Contents

1. Introduction…………………………………………………….. 4

2. Problem Statement………………………………………………4

3. Aims and Objectives.…………………………………………... 5

4. Methodology……………………………………………………..6

5. Scope and limitation……………………………………………...8

6. Literature Review……………………………………………….9

6.1 General……………………………………………………..9

6.2 Various Studies ……………………………………………9

7. Conclusion………………………………………………………14

8. References………………………………………………………..16

Table of Charts

4.1 Flow Chart…………………………………………………………7

1. Introduction

The Construction industry is large, volatile, and requires tremendous capital outlays. Typically, the work offers low rates of return in relation to the amount of risk involved.

Delays on construction projects are a universal phenomenon. They are almost always accompanied by cost and time overruns. Construction project delays have a debilitating effect on parties (owner, contractor, and consultant) to a contract in terms of a growth in adversarial relationships, distrust, litigation, arbitration, cash-flow problems, and a general feeling of apprehension towards each other.

2. Problem Statement

Many construction projects have been facing various problems and delays of time are a major problem. The delay in the settlement of disputes has multiple effects such as this will give the detriment of the relationship between the owner and the contractor. In addition, it will also contribute to cost overruns and time. The most serious problem is that it sends the wrong signals to foreign investors that slow national progress. It is generally said that the contract language is considered difficult to understand and they are a major source of conflict.

The survey results indicate that the majorit...

... middle of paper ...

... IE Rowings, Setting highway building contract duration.

Journal of Construction Engineering and Management, ASCE 1072 (1981), pages 169-179.

2. Battaineh HT. Information system of progress assessment of public projects in Jordan, MSc thesis, Dept. of Civil Engineering, Jordan Univ. of Science and Technology, Irbid, Jordan, 1999.

3. DM Leishman, Protecting against engineer Construction delay claims: NDC. Journal of Management in Engineering 73 (1991), pages. 319-333.

4. Abd El-Razek, ME, Bassioni, HAand Mobarak, AM (2008) "The causes of delays in construction of building projects in Egypt," Journal of Construction Engineering and Management, 134 (11) 831-841.

5. A.Aibinu et al (2002) "The effects of construction delays on project delivery in Nigerian Construction Industry" National and International Journals of Project Management, Vol. 20, pages 593-599.