Itt Trip Scheduling

Itt Trip Scheduling

Length: 1371 words (3.9 double-spaced pages)

Rating: Excellent

Open Document

Essay Preview

More ↓
ITT Trip Scheduling

The Information, Tours and Tickets (ITT) office could use a system to assist
them in creating trip schedules. In this paper I will outline a plan for a
Decision Support System (DSS) that will assist ITT in creating schedules for
their tours. This system will also track customer surveys and hold data about
all of ITTs trips. They already have some computer systems, a spread sheet
program and a data base management system (DBMS) which can all be used to build
a small DSS. Using the DBMS and the spread sheet software I have designed a
system to assist them in making decisions about scheduling trips. This system
also allows them access to information about all of ITTs trips and the feedback
from customers about each trip. In the next few paragraphs I go through the
major steps in developing a system of this nature. A system of this type goes
through several phases in its development. I start with the planning phase and
go on to discuss research, analysis and conceptual design. Then I talk a little
about the models used in this system. I finish by talking about the actual
design, the construction, and the implementation of the new ITT system. I
finish the paper with a discussion of maintaining the system.

The first step in building any DSS is planning. Planning is basically defining
the problem. The planning also involves an assessment of exactly what is needed.
In this case I deal with trip scheduling. In the case description this would
include: How many trips to offer, the days of the week to have particular trips,
and when to cancel trips. Obviously the scheduling ties to other information
such as profit and participation, but for this paper I will only cover the
scheduling portion of ITTs problem. Therefore I have defined the problem as a
basic scheduling problem. I see a need for ITT to better schedule trips using
the information they have and using the information they collect from customer
surveys. With the problem defined we can now look at what information is needed
to further analyze the problem.

After a problem is defined, information must be collected. The research phase
of system development is just that, collecting information. The information
collected will be used in the next phase of development to further analyze the
problem and it will be used in this case to build the databases. The databases

How to Cite this Page

MLA Citation:
"Itt Trip Scheduling." 123HelpMe.com. 24 Jan 2020
    <https://www.123helpme.com/view.asp?id=159021>.

Need Writing Help?

Get feedback on grammar, clarity, concision and logic instantly.

Check your paper »

Application For Self Scheduling And Retention Within The Healthcare Arena

- Background This literature review deals with self-scheduling and retention within the healthcare arena. Scheduling/ staffing has always been an ongoing process and issue involving retention. The connection of retention to self- scheduling reveals many times over that once nurses are satisfied with their schedule they can focus on improving care for their patients. Equally important, the satisfaction of knowing they are able to attend to their family needs and work life as well. Once job satisfaction is in place, a more productive and happier the staff/employee member becomes....   [tags: Nurse, Nursing, Employment, Scheduling]

Research Papers
1466 words (4.2 pages)

Essay on Disadvantages of Block Scheduling

- In order to properly research a topic, first an adequate definition is required. Kellough (2003) defined block scheduling as: The school programming procedure that provides large blocks of time (e.g., two hours) in which individual teachers or teacher teams can organize and arrange groupings of students for varied periods of time, thereby effectively individualizing the instruction for students with various needs and abilities. (439) Traditionally, schools schedule six or seven 40- to 55- minute classes per day....   [tags: Negtive Impact of Block Scheduling]

Free Essays
1109 words (3.2 pages)

Trip Gone Wrong: My Brother Went Missing Essay

- “C’mon, Jake. We’re going to be late!” I yelled at my far behind brother. “As fast as I can, sis.” The thing is, we’re heading on our first trip to Paris. Jake is going to leave for a few months to go back to the army for his shift as a Special Forces candidate. “Flight 54 to Toulouse, France now boarding. Plane doors close in eight minutes!” The loud woman’s voice echoed through the gigantic, busy building. As soon as we made it to the luggage scanner, I grinned with joy. “I can see it now, Jake....   [tags: plane, family, trip, france]

Research Papers
521 words (1.5 pages)

Aircraft Scheduling and Fleet Management Essay example

- The primary considerations for airline scheduling are routes that “provide optimum public service...consistent with the financial health of the carrier” (Wensveen, 2011). In addition to that, there are numerous other factors that must be taken into account. These factors include: equipment maintenance, crews, facilities, marketing factors, and other factors such as wind patterns and what I would call “rush hour”. The aircraft must be scheduled so as to allow adequate time for routine maintenance, as well as a buffer to meet unscheduled maintenance requirements....   [tags: airline safety,aircraft routes,aviation ]

Research Papers
1381 words (3.9 pages)

The Yasuni ITT Initiative Essay

- In 2007, the courageously hopeful President of Ecuador, Rafael Correa, announced the pioneering Yasuni ITT Initiative to the General Assembly of the United Nations ("What is the Initiative?"). It was a groundbreaking plan to save the unexploited ITT oil reserves (“What”). The initiative asked the world to donate $3.6 billion to Ecuador, in order to subsidize half of the profits the country would have gained if they opted for oil exploration (“What”). Regrettably, this visionary proposal to fight climate change recently failed in August 2013 (Associated)....   [tags: Ecuador, Rafael Correa, preservation]

Research Papers
2785 words (8 pages)

Scheduling Interview At The Panera Bread Company Essay

- The complainant, Ashley Meister and Dr. Carnett were both contacted July 19, 2016, and voice mails left, requesting each contact me to schedule appointments. Niki Sublet called July 20, 2016 to discuss scheduling an interview for Dr. Carnett. An Entry of Appearance was emailed to Ms. Sublet and returned the same day (See Attachment 1). Interview of Ashley Meister, 630 Houchin Dr, Jefferson City, MO Ms. Meister was interviewed July 28, 2016 at the Panera Bread Company located on Missouri Avenue in Jefferson City, MO and stated the following: She reviewed her written statement and finds it to be complete and accurate....   [tags: Nurse, Nursing, Childbirth, Florence Nightingale]

Research Papers
1489 words (4.3 pages)

Hilton ITT Case Study Essay examples

- 1. Why might Bollenbach have opened his bidding for ITT at $55 per share. What was his likely strategy. The $55 value is on the lower range of the analyst eztimates, with a best guess estimate of $67.94. Since the value of the stock had been below $45 for 4 months, the offer of 55 dollars represented a 29% premium to investors. Bollenbach knew that management would be resistant of any attempt to be acquired, regardless of price, because of failed previous attempts to negotiate a friendly merger at year end 1996....   [tags: Finance Business Analysis]

Research Papers
1431 words (4.1 pages)

Symbol, Allusion, and Myth in Irving Layton's Rhine Boat Trip Essay

- Symbol, Allusion, and Myth in Irving Layton's Rhine Boat Trip        "...haunted/by the ghosts of Jewish mothers/looking for their ghostly Children" (Layton). Though physical evidence of the Holocaust is now slightly limited, as time tends to destroy the tangible, the cry for justice and the remembrance of systematic genocide by a sadistic people enacting ignorant dogma will ring indefinitely throughout the world. Humanity will always be guilty of the atrocities that it instigates. Irving Layton, in his poem, Rhine Boat Trip, depicts the eternal evidence of the Nazi Crime, a stain of culpability that is reducible from all who have witnessed it....   [tags: Rhine Boat Trip Essays]

Research Papers
880 words (2.5 pages)

schools and scheduling Essay

- I. Title Page: Running head: OUTCOMES USING THREE SCHEDULING METHODS Which Schedule. Learning and Behavior Outcomes of At-Risk, Ninth Grade, Math and Science Students Using Three Scheduling Methods: Parallel Block Alternate-Day Block and Traditional Name University Name Name of Class / Title of Project / Name of Professor and his/her title Abstract Page: (State the Purpose of the Study) Abstract For many generations, high school students have had a schedule of six to eight periods a day with each class meeting every day for forty-five to sixty minutes....   [tags: essays research papers]

Research Papers
3133 words (9 pages)

Trip Essay

- THE TRIP It all started when my friend and I were off-roading and one of us had a marvel idea… “Wouldn’t this be fun to do in Colorado?” So it begins, I mention that I have a cousin that lives in Colorado, and that we could stay with him and his family. We planned the trip for August 10th. Turns out this will be the most liberating and most independent event in my life. Thursday, August 10th rolls around, we get and start loading the jeep, and hit the highway. Just knowing that we were on our own was such a big challenge for us, never in our lives have we gone on trip with out the financial support and guidance of our parents....   [tags: essays research papers]

Free Essays
530 words (1.5 pages)

Related Searches

will then be used with decision support system (DSS) models to assist ITT in
making scheduling decisions. Information in this case can come from their
current schedules and trip description fliers. Also during this stage of
development the current resources are assessed. This would include ITTs current
information systems and their current budget. And, information such as Navy or
ITT policies are collected as a reference. Once all the information is
collected than the system can move to the next stage of development, analysis.

With all the data and information collected analysis of it begins. In this
stage we determine what needs to be done to solve the problem. No work, on a
new system, is started yet, but a system is conceptualised and possible
solutions are identified. Also in this stage a final solution to the problem is
chosen and system passes through another stage of development. For the ITT
problem I have chosen a simple Management Information System (MIS) with small
decision support models to aid in creating schedules. This system will provide
ITT with the information they need to make decisions about scheduling their
trips as well as allow them to create the schedules directly from computer
models. I will discuss the models in the next paragraph. The system would not
draw conclusions, but simply show the pros and cons to certain choices. The MIS
portion of the system will simply provide information to the users and to the
DSS. The DSS portion of the system will allow a schedule to be created using
resources in an optimum manner. I decided to go with a small and simple system
because of ITTs limited resources and because of a high employee turn-over. A
complicated system would not be feasible in such an environment where new
employees are constantly having to be trained to use it.

In this paragraph I side step from the development a little to talk about the
models used in the system. As stated earlier the models used in this system
should be kept simple and small if possible. Using standard spread sheet
software, models can be created that will show the optimal schedule for trips.
The basic information required for these models should include bus schedules,
reservation requirements, customer satisfaction information, and cost data.
Other data can also be added to assist in decisions. The models would first
approximate the participation for each proposed trip. Then another model would
determine if the trip is feasible given the costs involved. The next model
would determine if the trip is even possible considering what is required as far
as reservations and transportation. Another model could also determine if the
trip would be able satisfy the customers given the past customer inputs.
Finally after determining whether each trip is worth offering the ITT employees
could use the computer to generate a new schedule. Now that we know what the
system should do we can turn our attention to the design of the system.

In the design phase of DSS development the new system is designed to solve the
problem. Here the information collected and the resources identified are
examined to decide exactly what must be done and in what manner to solve the
problem. Diagrams may be drawn to show how the components will fit together.
Also the ground work is laid for the construction phase. In the ITT case I
designed a database that contains information on all their trips along with
information obtained from the customer surveys. This information is then
combined with bus and reservation data in a standard spread sheet where it is
manipulated to optimize the trip schedule. A manager or an employee can then
use the information and the data in the database to create a calendar of events
using an inexpensive program ‘Calendar Creator.' Which is what ITT currently
uses to create schedules manually.

The construction of a system is the bringing together of all the required parts
and making the system do what it's supposed to do. In this case the system I
have designed will only require a minimum of additional resources. I designed
the system to work on their existing computers using their existing software.
The databases and the spreadsheet models could be built by knowledgeable
employees with minimal outside help. Once constructed the system could be run
and results compared with the old system to determine if it is functioning
properly. The results could also tell if the system is optimizing the schedule
or just speeding up what is already done manually.

Implementing any system is the process of putting it into use. In this project
the implementation phase should be a fairly easy conversion. The old way of
manually deciding on trips and putting the results into Calendar Creator is
simply replaced with an automated selection of trips that the employee can use
to create a calendar. When the system is operating normally it should improve
the way ITT does business.

After implementing this system it will have to be maintained. New models will
have to be added and old models will have to be changed or removed. With the
simple models used in this system that should not be difficult. The hardest
component in this system to maintain will be the databases. They will have to
contain the most current data in order for the system to operate properly. I
suggest a data checking module be added at some point in order to maintain data
consistency. Inconsistent data is something that can degrade the system
performance and cause it to give inaccurate or incorrect information. A data
checking module will insure that the information entered into the system is
accurate and consistent with the rest of the system.

There could be many solutions to this problem, but given the limited budget most
are not feasible. The system I have designed should be more than sufficient to
assist them in creating schedules faster and more efficiently. Also it will
give customers more of what they want and should improve repeat business.
Return to 123HelpMe.com