Personal Narrative Report

256 Words1 Page

I planned, coordinated and supervised the construction of a 35 Kilometer perimeter berm at FLB DOGWOOD, Iraq. This was the earliest complete fortifications around the perimeter of a base that housed more than eight thousand Soldiers. My engineering expertise was critical as units pursued the improvement of security of the Iraqi infrastructure in the Multi-National Division (South East) Area of Responsibility (AOR). I effectively mentored and worked with Base Defense Liaison Team of the 317th Rear Area Operations Center (RAOC). I provided guidance, oversight and design on perimeter Entry Control Points (ECPs) and conducted weekly checks and improvements to improve Force Protection (FP). I inspected mounted guard posts, initiated requests for

Open Document