Naval Condition Verification Surveys

2445 Words10 Pages
• HIMP Report- 2-D tool that stores all of the survey results, recommendations, and set the required Survey and renewals at a give time interval. 3.2 Naval Condition Verification Surveys (NCVS) After completing the BSLA a verification survey is to be made within three (3) years, six (6) months before or after, the completion date of the service life assessment. 3.2.1 Structural Survey and Gauging The verification survey shall consist of an examination of any incomplete high risk areas, identified moderate risk areas, one-third uninspected tanks, gauging, and a general examination of the structure and machinery. The inspection and gauging (as necessary) of approximately one-third of the tanks and void spaces will be necessary at each NCVS. Upon completion of the survey a Survey Report will be completed. Additionally, all survey results will be recorded in the HIMP and HMM programs. Any significant anomalous conditions may also result in engineering analysis to determine impact to the estimated fatigue life. 3.2.2 Engineering Assessment As part of a NCVS, engineering will review the results of any gaugings that have been taken as a result of the required surveys. A report of any recommended repairs will be prepared. There will be no update to the fatigue assessment at this time. Any engineering work based on damages found in critical areas or in other areas of the vessel will be subject to a unique scope of work and fee estimate. 3.2.3 Deliverables As a result of the NCVS processes five (5) main products are developed: • Verification Report – This report consolidates the finding and recommendations of the survey report and recommend repairs report. The verification report prioritizes anomalous conditio... ... middle of paper ... ...rvey estimate for each port is based on the following assumptions: • Each BSLA requires 1.5-2.5, depending on vessel size, equivalents of Surveyors; an initial effort of 2-3 surveyors to conduct the gauging and 1-2 follow on surveyor to finalize the survey. • Each NCVS requires 1-2, depending on vessel size. Resource Type FY11 FY12 FY13 FY14 FY15 FY16 Project Manager 2 2 3 3 3 2.5 Naval Engineer 8 8 8 8 8 8 ABS- IMS Applications 15 11 5 4 2 2 Newport News Survey 5 5 7 6 7 7 San Diego Survey 4 5 4 4 2 2 Seattle Survey 1.5 0 0 1.5 0 1 Jacksonville Survey 0 2 1.5 1.5 2 2 Honolulu Survey 1.5 1.5 2 1.5 1.5 0 Sasebo Japan (Nagasaki Office) 0 2 0 0 1.5 0 Yokosuka, Japan (Yokohama office) 1.5 1.5 1 1.5 1.5 1.5 Total 38.5 34 30.5 29 28.5 26 7.2 Program Team Organization The following chart outlines the basic program organizational structure

    More about Naval Condition Verification Surveys

      Open Document