Analysis Of PT Bukaka Teknik Utama

761 Words2 Pages

Rapid technological developments cause a person to have to move quickly to do the work, meet other people in terms of business and so on. So it takes a sophisticated means of transport that facilitates the transfer of the position. Transport aircraft and ships are one of the widely used transport humans are now being able to travel long distances in a short time. The more dense the activity of the trip by plane or ship caused the airport authorities and port should minimize the time of loading / unloading of passengers and goods in order that the process of change in aircraft or other marine vessel can run fast, smooth and timely manner. So the waiting time of passengers do not spend a long time. Based on the above conditions required tools …show more content…

PT Bukaka Teknik Utama Tbk has 9 business units one of which is a business unit Passengger Poarding Bridge which produces garbarata. The company is the only one in Indonesia producing garbarata / passenger bridges for aircraft at airports and on ships in the harbor. Garbarata product has two types, namely the type of glass / glass and the type of steel / steel. The production process is carried out through four workshops with 5 stasuin work includes workshops 1 work station Preparation, workshop 2 work stations Fabrication, workshop 3 stasuin work Blasting and painting (BLP), and the workshop 4 which has two satasiun work that Final assembly and test (FAT) and Electrichal and control (ELC). The production process takes place on the raw materials / material until it becomes a final product that is ready to be garbarata installed at airports and …show more content…

So the production process should run every day to meet demand and the target production time is reached or timely. The business unit BRB (Bukaka Ramp Boarding Bridge) using manufacturing systems Engineering To Order is the product specifications of the customers require unique engineering design or significant customization, and the customer usually involved in product design. This unit also introduced a system of subcontracting labor every day to malakukan this production process. Subcontract labor is recruited from some of the company's existing workforce providers such as PT Musi Raya, PT Bagja Putra Sirait, and PT Indo Utama star with a contract system. Problems that occur in the production is the imbalance between the production process stasuin work caused by the setting and calculation of the amount of labor that is unfavorable imbalance between the work stations. This situation causes a buildup of product / product wait for the next process, the machine does not work, the operator / worker unemployed so the production process is not smooth and planning that has been made often do not correspond to the actual conditions in the field and will be able to result in delays prduksi target time later. The main problems are the lack of regulation procedures / stages of the production process from start to finish so that the image of

Open Document