The Hoover Dam is a modern marvel and a testament to American ingenuity. At over six million six hundred thousand tons and jetting seven hundred sixty feet from the canyon floor, six hundred sixty feet across the bottom and, one thousand two hundred forty four feet across the top, the structure is awe inspiring even to a modern audience. Three quarters of a century since its completion it still stands as a symbol of one of the greatest construction projects of the ages. The need for a dam to block the Colorado River was not a new idea when construction began in 1931, but had been mulled around since the dawn of the century. Flooding due to runoff from the Rocky Mountains had devastated crops, and a need for hydroelectric power increased the need for a dam. In 1922 Black Valley was chosen as the spot for the dam’s construction. No one construction company was large enough to take on the project alone, so a group of companies formed a joint venture in order to bid the job. The Six Companies Inc. made up of Morrison-Knudson, the J.F. Shea Company of Portland, MacDonald & Kahn Ltd, Pacific Bridge Company of Portland, Henry J. Kaiser, Bechtel Company of San Francisco were awarded the winning bid for the dam at forty eight million eight hundred ninety thousand nine hundred fifty five dollars. The construction management team had a Herculean task in building this behemoth and faced many problems in its construction. A few of the major issues posed to the team were diverting the Colorado River, provisioning the men and material to get the job done, and the actual construction of the Hoover Dam. The heights involved with project led to many safety obstacles that had to be overcame.
Diverting the powerful Colorado River had to be ...
... middle of paper ...
...ementation of diverting the Colorado River, provisioning the men and material to get the job done, and constructing the dam are great examples of how an effective construction management team can get things done no matter the scale or complexity of work. The crude cloth hats soaked in tar worn by some of the workers led the construction management team to equip all of the individuals working on the project with hardhats. This decision led to a sharp decrease in fatalities due to falling objects. When the dam was dedicated by President Franklin Delano Roosevelt on September 30th, 1935 he quoted Julius Ceaser by stating,” I came, I saw I conquered”, which was very fitting for this great accomplishment of American knowhow and resourcefulness. Many dams have since surpassed the Hoover Dam in size and output, but the Hoover Dam will forever have a place in history.
The primary purpose of Friend dam is to help regulate the flow of San Joaquin into available uses of its environmental, wildlife, and farmer’s impacts. The dam controls the flow of water delivery where it needs authorization first before the schedule can release any delivery waters into canals, steam, and wild life habitats. There will be agreements and many protocols to do with it first to avoid unnecessary spilling. There are 5 release schedules which include quantity of water available, time water, flood control requirements, release schedules from storage reservoir above Millerton Lake, and water user requirements. These benefits of flood control, storage management, modification into Madera and Friant-Kern Canals, to stop salty water from abolishing thousands of lands in Sacramento and throughout San Joaquin Delta, as well as deliver masses of water into agricultural lands in 5other counties in the San Joaquin Valley.
Wuerthner, George. North Idaho's Lake Country. Helena, MT: American & World Geographic Pub., 1995. Print.
Grand Coulee Dam is a hydroelectric gravity dam on the Columbia River in Washington State, built by industrialist Henry J. Kaiser It is among the most famous dams in the United States. The reservoir it created is called the Franklin Delano Roosevelt Lake. The reservoir is named after the United States President who seemed to love dams and hydroelectric power and who was involved with the project through to the final completion of the dam. The dam was built as part of the Columbia Basin Project as a way to irrigate the desert areas of the Northwest United States. The dam started during the 1930s as a public works project and finished toward the beginning of World War Two. The initial construction plan was reconfigured during construction for more height. Its height was determined by the point at which the water from the reservoir began backing up into Canada. The scope and size of the dam is hard to comprehend. It is over a mile long and taller than the Great Pyramid of Giza, in fact, all the pyramids at Giza can fit within the base of the Grand Coulee Dam. The dam is so large that a truck at the base looks like a toy, this creates some perspective into the dam's true size. When the dam was completed in the early 1940s it was the largest dam in the world.
In the 1898 mayoral election, Frederick Eaton was elected as mayor of Los Angeles; and appointed his associate, William Mulholland- the superintendent of the newly created Los Angeles Department of Water and Power. Eaton and Mulholland envisioned a region of Los Angeles that would make Los Angeles become the turn of the century. The limiting factor of that regions growth was water supply. Eaton and Mulholland realized that the Owens Valley had a large amount of runoff from the Sierra Nevada, and a gravity-fed aqueduct that could deliver the Owens water to Los Angeles. During the early 1900’s the United States Bureau of Reclamation made plans to build an irrigation system to help the farmers of the Owens Valley. By 1905, through purchases, and alleged intimidation and bribery, Los Angeles purchased enough water rights to enable construction of the aqueduct.
The Hoover Dam turbines provide a great amount of electricity to those living in the states of California, Arizona, and Nevada. The water level of Lake Mead currently affects the dam’s ability to provide power from the large sized turbines. When the water level of Lake Mead goes down from conditions affecting it, the dam’s ability to provide power directly affects the power companies supplying consumers. Fortunately, the water levels gained back some of that full amount while still shy of where it once existed. As stated, “But the increased elevation isn’t enough to reopen any of the four boat launch ramps closed in the past decade, Holland said” (Shine, C., 2011, para. 9). This definitely indicates that there is currently promise to recovering with close to the original levels even though it may not be excessively soon.
Based on the events that lead to the devastating floods in Queensland and the eventual case that was brought against the engineers of the dam, there have been views from both sides of the divide as to whether or not the actions taken by the engineers were actually ethical or otherwise. We have explored this avenue and have found that both sides of the divide have good reasons to justify their actions. Firstly, we shall explore the avenue that the engineers decisions were appropriate and ethical. It can be said that the engineers did employ act utilitarianism in their decisions and actions, hence causing these decisions to be ethically correct. Act utilitarianism is essentially doing the right thing, which would benefit the majority of people, based on the situation that is currently taking place. One of the reasons that explains why the actions taken could be considered as ethically fine, was that if the dam was not opened, there would have been no other way to solve the increasing water levels in the dam. If no action was taken, there could have been seriously devastating effects, like the dam wall eroding due to water spilling over the dam wall, thus weakening the structure, or a loss of water flow control. Professor Hubert Chanson, a professor in hydraulic engineering in the University of Queensland, mentioned that the Wivenhoe Dam was actually designed as an embankment dam, hence it should not be overtopped, that is water should not be allowed to flow over the limits of the dam (Andersen 2011). Despite there being a secondary spillway, however it is recommended that spillway is not put to use, as the use of that spillway would mean that there would be a surge of water leaving the dam, and a loss of control of the water flow, w...
Most of the destructions from the events of August 29th 2005, when Katrina Hit the City Of New Orleans, were not only caused by the storm itself; but also, by failure of the engineering of the levee system protecting the entire infrastructure of the city. The years of poor decision making and avoidance of the levee system led to one of the most catastrophic events in the history of the United States. Throughout our research, we have identified three key players in charge of the levee system design, construction and maintenance. These three organizations are the Unites States Corps of Engineers, the New Orleans Levee District and the Louisiana Department of Transportation. The consequences of the hurricane showed the organizations negligence in the design, construction and maintenance of the protective walls. Later independent sresearch showed that more than 50 levees and food walls failed during the passage of the hurricane. This failure caused the flooding of most of New Orleans and all of ST. Bernard Parish. The Unites States Corps of Engineers had been in charge of the of the levee system and flood walls construction since the 1936 flood act. According to the law, the Louisiana Department of Transportation is in charge to inspect the overall design and engineering practices implemented in the construction of the system. Once the levee systems were finished, they were handed over to the New Orleans Levee District for regular maintenance and periodically inspections. The uncoordinated actions of these three agencies resulted in the complete failure of a system that was supposed to protect the people of New Orleans. The evidence is clear that this catastrophic event did not happened by chance. The uncoordinated response of these...
... the dam, leaving the workers to use just mud and some wood to try to reinforce the weakened dam. Further the fish screen that was installed to ensure that the South Fork Fishing and Hunting Club did not lose any fish to the dam turned out to be a major catalyst in the dam’s final defeat. The failure of the dam to let off pressure due to the debris stuff in these net made what could have been avoided a certainty.
1902 The Bureau of Reclamation is established to construct dams and aqueducts in the west.
What: it gave jobs to unemployed workers. 726 ft high and 1,244 feet long. World's tallest dam, and second largest dam. Provided electricity and flood control, and regular water supply.
The water wars began proper in 1898 when Frederick Eaton was elected as the mayor of Los Angeles. One of Eaton’s first business matters was to appoint his friend William Mulholland as the superintendent of the Los Angeles Department of Water and Power. The two held a grand vision that Los Angeles could become one of the nation’s great cities if given the proper time and care to expand. The one factor that seriously limited growth was a lack of a water supply that could support such a massive undertaking. The solution was simple- to build an aqueduct, which would become the world’s largest water system at the time, from the Owens Valley 223 miles away. The val...
The thirties was a time of anxiety -- after the major stock market crash of 1929, the Great Depression was sparked. The economy is in the dumps, crime rate increased, mass migrations occurred, and much more. This despair inducing time caused a majority of the American people to be poor, or if they were rich before the incident, they would at least have a much less amount of money than they had before. Many people were looking for jobs, but the country did not have any jobs to offer them. Then soon enough, the president at the time, Herbert Hoover, issued the creation of the Hoover Dam, which had opened up a large amount of jobs for the people. Sure, the job was extremely dangerous -- hundreds died in the creation of the large dam -- but the people needed money. They would’ve done almost anything in the economic grave that they dug themselves in at this point. They originally hired mostly Chinese immigrants to build the dam, but soon enough, more people in need of money were up for the job. They also started using concrete for the Hoover Dam, which has stuck until today’s time, in which most buildings are made up of concrete. Concrete is so relied on today due to its toughness and durability. The Hoover Dam popularized the use of concrete in building.
In the beginning of the construction of the Three Gorges Dam, there were several problems. There were several protestors and opinions about the dam before the Three Gorges Dam project was even started.1 China has had history of several dam failures in the mid-1970s that were responsible for thousands of deaths. The three gorges (Xiling, Wu, and Qutang) have scenery that is a tourist attraction.2 The dam was going to be a little over 600 feet tall, 7500 feet wide, and hold over 97 trillion gallons of water. Because of all of the population increase, China started using coal power plants1 and shipping, which causes acid rain over the region making the Yangtze River is one of the most polluted rivers in the world.4 It does not help that the Yangtze River runs right through Chinas industrial heartland. Using the river to transport their goods to other parts or China adds to the pollution.2 Pollution from mines, hospitals, and garbage dumping is another big problem for the river because the pollution is building up around the dam.1 With the Three Gorges Dam will come landslides because of the rising water tables and the large slopes with unstable soil from local farming causing more sediment being added to the river.3 And because the dam lies on a fault line there will also be an escalation of earthquakes. There is a huge decrease in sediment discharge; which caused a 90% sediment load into thousands of other reservoirs. Before the dam was operational, it was retaining water and sediments.4 The water levels were rising faster than anyone expected, therefore, the finish date had to be moved up.1 Scientists even projected that 70% of sediment discharge would be trapped for the first two decades and 44% would be store...
There are nine dams in and directly leading to New York State’s Letchworth State Park. These dams have been built for a variety of reasons and affect nearly 400 miles of freshwater rivers in the Genesee River Basin of Western New York (Fish, n.d.).
UNITED STATES DEPARTMENT OF THE INTERIOR AND BUREAU OF RECLAMATION. (1985) Hoover Dam. Washingto, D.C., pp. 56.